Castle Hill Hospital

Castle Hill Hospital

IUS were contracted by Hull University Teaching Hospitals NHS Trust to install the 11kV Infrastructure for a new 5MWe Solar Farm on land adjacent to Castle Hill Hospital ...

Client

Hull University Teaching Hospitals NHS Trust

Project

11kV Infrastructure for a 5MWe Solar Farm

Location

Castle Road, Cottingham, Hull

SERVICES PROVIDED
  • HV network design
  • P28 / G99 reports
  • G99 protection design
  • Earth design and report
  • Civils construction designs
  • Ground survey reports
  • Installation of 11kV infrastructure (cable installation and civils, transformers, and switchgear)
  • Test and commissioning
OVERVIEW

IUS were contracted by Hull University Teaching Hospitals NHS Trust to install the 11kV Infrastructure for a new 5MWe Solar Farm on land adjacent to Castle Hill Hospital, as part of the trusts plans to become carbon neutral by 2030.

DESCRIPTION

IUS provided expert support for the scheme, by designing the HV network, P28/G99 studies and reports, G99 protection study, earthing report, ground surveys & borehole analysis, heat gain calculations, construction designs and all other relevant design requirements. IUS constructed two substations inclusive of HV compounds, LV plant rooms and inverter rooms. The cable/duct installation carried out by IUS, involved excavation by conventional open cut trench, as well as horizontal directional drilling method.

IUS supplied and installed:
1x 2MVA transformer, 1x 3MVA transformer, 2x 11kV ring main units, 2x battery tripping units and relay panels. The IUS scope of service included an in depth and technical G99 protection scheme, installed in compliance with the local Distribution Network Operator, Northern Powergrid specification.

IUS provided a dedicated project team to ensure the day-to-day running of the project was carried out safely, efficiently and to a high quality standard, to the client’s satisfaction. IUS also provided our ‘in-house’ senior authorised person and technical service support throughout the project to ensure safe systems of work were implemented and maintained and equipment/protection was pre-commissioned to the highest of standards.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.