At Integrated Utility Services (IUS), we specialise in delivering practical engineering solutions to complex industrial challenges, and this project we carried out last year at Kemira Chemicals' Bradford facility is a great example.

Kemira commissioned IUS to replace the site's last remaining oil-filled High Voltage switchgear, alongside the installation of a new transformer, and all required cable connections.

Due to production requirements and access constraints, the new equipment could not be installed in the same location as the existing assets. Our team developed a solution that allowed the new infrastructure to be constructed in a separate location, enabling a carefully planned shutdown to be completed with minimal disruption to the customer's operations.

Working within a highly constrained area, we designed and installed a bespoke ladder racking system to support the HV cable network while maximising the limited space available. Detailed engineering, careful planning, and precise installation ensured safe cable routing, long-term reliability, and efficient use of the site footprint.

Projects like this demonstrate the importance of flexibility, collaboration, and an uncompromising commitment to safety. A huge credit goes to everyone involved in the design, planning, and delivery of this successful scheme.

✅ Replacement of legacy oil-filled switchgear
✅ New High Voltage transformer and switchgear installation
✅ Bespoke ladder racking and cable management solution
✅ Delivery within a live chemical manufacturing facility
✅ Safe management of asbestos discovery and removal
✅ Minimal operational disruption through strategic planning
 

News Image
High Voltage Installation at Kemira Chemicals
summary
We specialise in delivering practical engineering solutions to complex industrial challenges, and this project we carried out last year at Kemira Chemicals' Bradford facility is a great example.

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

Teesside Solar Farm Substation
IUS Install Infrastructure for Teesside Solar Farm
IUS supported High View Energy and ROC Energy with the delivery of the new electrical connection for the ongoing project at Teesside Solar Farm. The substation has been constructed in advance of the solar panels being installed.
Powering new homes at Spa Road, Gainford
Integrated Utility Services is proud to have supported the Wharfdale Homes development at Spa Road, Gainford, delivering essential utility infrastructure to support 80 new domestic plots.
IUS Driving Sustainability Forward
As part of our ongoing commitment to reducing our environmental impact, you'll start to see new sustainability badges appearing across the Integrated Utility Services fleet.