DNO Frameworks Northern Powergrid Areas

DNO Frameworks Northern Powergrid

IUS currently deliver an extensive portfolio of frameworks for Northern Powergrid (NPg). These ...

Client

Northern Powergrid

Project

Multiple Frameworks

Location

North East and Yorkshire

SERVICES PROVIDED
  • Overhead line construction
  • LV overhead line shrouding
  • Overhead line inspections and remedials
  • Overhead line maintenance
  • Substation automation
  • Ground mounted HV maintenance
OVERVIEW

IUS currently deliver an extensive portfolio of frameworks for Northern Powergrid (NPg). These encompass both overhead line (OHL) and ground mounted (GM) works. Over a considerable number of years, IUS has been consistently achieving exemplary customer satisfaction by delivering a safe, compliant and quality service. The customer satisfaction achieved is not only with the client but the millions of customers connected to the NPg network.

DESCRIPTION

IUS deliver extensive low voltage (LV) OHL rebuild and refurbishment works, replacing NPg’s open wire network with Aerial Bundled Conductor (ABC) and changing rotten and defective poles where required. IUS also delivers LV OHL shrouding works for NPg, where protective shrouding is placed over exposed LV conductors to allow customers to have building and construction works completed in close proximity to the LV network. IUS exclusively deliver these works for NPg, managing the end-to-end process to strict customer service and guaranteed standard guidelines. In addition to these two core overhead line frameworks, IUS also deliver OHL inspection and remedial works for NPg, ensuring that their high-risk sites meet the necessary ESQCR standards required. IUS also deliver OHL earth tests and earth mat replacement works.

IUS is the sole deliverer of GM Automation works. On this framework, IUS instals actuators and Remote Telecontrol Units (RTU’s) in to existing NPg secondary substations. Once commissioned, these sites become automated, meaning that NPg’s Network Control Center can operate their switchgear remotely, improving restoration and response times for their customers in the event of network faults or damages. In addition, IUS also delivers GM HV substation maintenance and Fault Path Indicator (FPI) replacement works for NPg. Delivering this service, ensures that their HV network is kept up to standard and will operate as necessary when worked-upon or in the event of a fault or damage.

To deliver the above frameworks, IUS has an extensive direct team of Project Managers, Project Coordinators, Planners, Supervisors, SAP’s, AP’s, Fitters, Linesmen and Jointers. All of these staff are fully authorised to work and operate on NPg’s LV and HV overhead and underground electrical networks. They are all centrally managed, which assists with a consistent approach including efficient programming.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

Integrated Utility Services Fleet
IUS Business Growth and Major Recruitment Drive for 2025
Integrated Utility Services (IUS) is pleased to announce continued growth in 2025, driven by a series of large-scale project wins and successful framework awards across the UK
New IUS Wagon
Our brand new specialist MAN crane wagon
This impressive vehicle is a major upgrade from our previous model, boasting a PALFINGER AG PK 53002-SH crane and drop sides, allowing us to handle and transport larger assets more safely and efficiently than ever before.
RoSPA Order of Distinction
IUS Awarded RoSPA Order of Distinction
Integrated Utility Services is proud to have achieved the RoSPA Order of Distinction after receiving 22 consecutive Gold Awards for health and safety performance.