11kV Switchgear Replacement at Yorkshire Water Marsh WPS

Marsh WPS is a treated water pumping station in Huddersfield located at the side of Marsh Service Reservoir in a residential area. The pumping station was built in the 1990’s as part of the drought alleviation scheme. It also serves to assist the Yorkshire Water (YW) grid team with the regions treated water network and stock, supporting Black Moor Foot when required. The purpose of the scheme was to replace the existing Igranic 11kV circuit breaker (CB), which had reached the end of its asset life with a new CB.

Loch Ness Regional - Water Treatment Works (WTW) - New Extra High Voltage (EHV) / Low Voltage (LV) Supply

In total IUS completed five individual service connections on the west bank of Loch Ness that formed part of Scottish Water’s Regional Improvement Scheme ...

Drumboyhill Bpt & Shieldhill Farm Cathodic Protection

Scottish Water engaged IUS to install a new 3 phase supply to their Pumping plant at Drumboyhill and Single Phase Supply to their new Cathodic protection at Shieldhill Farm ...

Gorbals Pumping Station 11kV Contestable Connections & Private Infrastructure Works

IUS completed the electrical construction works associated with the prestigious Gorbals Pumping Station project. The power for the three 1.2MW pumps ...

Loch Ness Regional – Raw Water Pumping Station (RWPS) - New Extra High Voltage (EHV) / Low Voltage (LV) Supply

The development of a new RWPS on the west bank of Loch Ness formed part of Scottish Waters Regional Improvement Scheme ...

Scottish Water - South Lanarkshire WwTW - New LV Supply

IUS was appointed by Scottish Water to procure a LV supply to support their CSO screening facility at Coalburn Road, South Lanarkshire ...

Scottish Water - Ardersier WwTW - HV-LV Supply

IUS was appointed by Scottish Water (SW) to provide a new HV supply to support the planned extension to the existing wastewater treatment works at Ardersier ...

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

Full NERS accreditation for Network Connections Operational & Jointing (11kV & 20kV)
Full NERS accreditation for Network Connections Operational & Jointing (11kV & 20kV)
We are proud to announce that we have successfully achieved an LRQA NERS scope extension, securing full NERS accreditation for Network Connections Operational & Jointing (11kV & 20kV). This milestone reflects the strength, capability, and professionalism of our teams delivering high‑quality connection works across the UK.
IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.