Loch Ness Regional – Raw Water Pumping Station (RWPS) - New Extra High Voltage (EHV) / Low Voltage (LV) Supply

Lochness Pumping Station

The development of a new RWPS on the west bank of Loch Ness formed part of Scottish Waters Regional Improvement Scheme ...

Client

Scottish Water

Project

Loch Ness Regional - Intake RWPS – Provision of new HV / LV supply

Location

Invermoriston, Loch Ness

SERVICES PROVIDED
  • Full design role
  • Principal contractor duties
  • Engagement with the SSEN, Forestry Scotland, client’s other contractors and all other key stakeholders
  • All civil works
  • Overhead line construction
  • SAP duties
  • Turnkey solution
  • Management consultancy of directional drilling
OVERVIEW

The development of a new RWPS on the west bank of Loch Ness formed part of Scottish Waters Regional Improvement Scheme. The scheme would provide an upgrade to improve the water quality and system resilience to the area. As part of the Scottish Water’s Supply Chain, IUS delivers contestable connections as an Independent Connections Provider. Therefore, IUS was appointed to design, procure and deliver the new electrical supply to operate this new pumping station.

DESCRIPTION

The works necessitated the installation of new H-Poles adjacent to the existing Scottish Power Energy Networks (SSEN) overhead line. These Hpoles would accommodate the installation of a 33,000/433V, 200kVA pole mounted transformer (PMT) and associated components. From the LV side of the PMT, a LV cable was laid to the new RWPS kiosk, terminating in a cutout beneath the installed current transformer metering panel. 

The feeder route necessitated a road crossing. To minimize disruption to traffic flow on the A82, the road crossing was undertaken by directional drilling.

Extensive engagement with SSEN was maintained throughout the duration of the works to ensure full compliance with their adoptable standards. On completion the substation was energised and the RWPS is now in full operation.

IUS undertook full design duties and operated as Principal Contractor (PC) for all our site works, liaising closely with Scottish Water’s own PC for the main development.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.