Melton Wind Farm 33kV Contestable Connection & Private Infrastructure Works

Melton Windfarm

IUS have completed the electrical construction works associated with the Melton Wind Farm ...

Client

Melton Wind Ltd / Seneca Global Energy

Project

Melton Wind Farm

Location

Gibson Lane, Melton, Hull, East Yorkshire

SERVICES PROVIDED
  • Outline and detailed design(Electrical and civil)
  • 33kV Contestable connection work
  • On site private 33kV infrastructure work
  • Procurement of equipment
  • Construction of primary substation building to DNO standards
  • HDD railway crossing
  • Possession planning
  • Installation of 33kV switchgear
  • Installation of containerised substations on raised platforms
OVERVIEW

IUS have completed the electrical construction works associated with the Melton Wind Farm development. The connection of the two 2.3MW Wind Turbines to the grid required a 33kV extension to the Northern Powergrid (NPg) electrical network. IUS were appointed to undertake the design and installation of the 33kV contestable elements of the connection works, along with the private 33kV and LV infrastructure.

DESCRIPTION

The project involved the construction of a combined building to house the 33kV NPg intake substation equipment and the customer owned 33kV switchgear.

The 33kV cable route to the new substation required the crossing of the Hull–London Railway Line by Horizontal Directional Drilling (HDD) methods. The IUS scope of works included all negotiations with Network Rail, HDD design and settlement calculations, possession planning and drilling operations.

The private electrical infrastructure installed by IUS included; 33kV, pilot and LV single core cables; a three panel 33kV switchboard; protection equipment; substation ancillary apparatus and two 2.5MVA containerised substations on raised platforms (flood risk mitigation).

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.