Northern Powergrid Asset Replacement Works In Doncaster

Northern Powergrid Asset Replacement

IUS has a framework in place with Northern Powergrid, which includes asset replacement activity. IUS has been ...

Client

Northern Powergrid

Project

Asset replacement

Location

Franklin Crescent, Doncaster

SERVICES PROVIDED
  • Substation survey
  • Outage planning
  • Safe systems of work
  • Civil excavation
  • Switchgear removal
  • New switchgear installation
  • Transformer cable box change
  • 11kV cable jointing
  • Testing and commissioning
  • Handback documentation
OVERVIEW

IUS has a framework in place with Northern Powergrid, which includes asset replacement activity. IUS has been commissioned to deliver six 11kV switchgear replacements in 2022, where aged oil insulated equipment will be replaced with new High Voltage (HV) apparatus, which will enhance the Northern Powergrid network. This is the type of work IUS also deliver for customers with privately owned HV apparatus.

DESCRIPTION

IUS conducted detailed surveys of these secondary 11kV substations on Northern Powergrid’s behalf to ascertain the requirements for the delivery of the works. The survey encompasses asbestos removal, street work notices, if generation is applicable, network transfer at low voltage, any civil adaptions, as well as liaison with the local community via letter drops for planned outages. This all takes place to ensure a problem free switchgear replacement.

Following the implementation of Safe Systems of Work by the IUS Senior Authorised Person (SAP), oil filled Yorkshire Switchgear and Circuit Breakers are removed by our electrical fitters in conjunction with the IUS HIAB driver. A new Schneider Electric RN2C Ring Main Unit (RMU) is then installed in its place. The original switchgear is returned to Northern Powergrid for recycling. The IUS electrical fitters secure the new RMU in place and make the necessary connections to the existing earthing system within the substation. The transformer 11kV compound filled box is replaced with a new ‘dry box’ unit, allowing for the installation and termination of 300mm triplex cable. This cable is installed from the jointing position, outside the substation, where it is straight jointed to the existing Northern Powergrid 11kV network by the IUS cable jointers.

The IUS SAP completes the work via continuity, insulation resistance and pressure testing prior to the substation equipment being energised. All subsequent test results and hand back documentation is collated and returned to Northern Powergrid for their records.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS LRQA ISO 9001 & 14001
IUS renew LRQA ISO 9001 & 14001 certifications
Integrated Utility Services are proud to announce that we have successfully renewed our LRQA ISO 9001 (Quality Management) and ISO 14001 (Environmental Management) certifications, now valid through to 2028.
CONCOM Contractor Competency Audit
Integrated Utility Services successfully achieved a 100% score on our CONCOM Audit, established by The Humber Contractor Competency Forum, this plays a vital role in ensuring high standards across the contractor supply chain.
Integrated Utility Services Fleet
IUS Business Growth and Major Recruitment Drive for 2025
Integrated Utility Services (IUS) is pleased to announce continued growth in 2025, driven by a series of large-scale project wins and successful framework awards across the UK