Northern Powergrid Automation Commission - Spring Bank

Northern Powergrid Automation Commission

IUS has been involved in supporting Northern Powergrid automation for many years in a bid to help sustain and improve the infrastructure and network control remote ...

Client

Northern Powergrid

Project

Automation

Location

Spring Bank Road 644, Farsley, Leeds

SERVICES PROVIDED
  • Test/Commission of RTU & Actuators.
OVERVIEW

IUS has been involved in supporting Northern Powergrid automation for many years in a bid to help sustain and improve the infrastructure and network control remote switching capability which lessons power outages for customers should a fault or trip occur. As such IUS provides installation, commissioning, and technical support to Northern Powergrid, which improves network restoration time and remote switching capability for 11kV ground Mounted switchgear.

DESCRIPTION

The work involves carrying out a detailed survey of a substation to ascertain if the site is suitable for automation. The survey considers the switchgear installed, network design required by Northern Powergrid and signal strength tests for connectivity to a secure communication network. The survey would identify the automation equipment to be installed by approved remote terminal unit (RTU) installers, and later actuators to be commissioned by an IUS senior authorised person (SAP).

Site installation of the RTU was carried out following a successful site survey to identify where the unit would be wall-mounted and umbilical cables run between RTU and the switchgear already pre-installed. The design incorporates fault path indicators to be automated and wired into the RTU that indicate back to control if a fault occurs.

Commissioning of the site was carried out by an authorised SAP. Final connections were made onsite and local operational tests were carried out. Once satisfied that the installation was operationally ready the SAP would contact the control desk engineer and carry out any network reconfigurations required under a system outage to allow remote operation. Remote testing is accomplished by the control desk engineer and the Automation equipment made operational on the Northern Powergrid network.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.