Body

We’re excited to welcome the newest addition to the Integrated Utility Services fleet – our brand new specialist MAN crane wagon from Vehicle Lease and Service!

This impressive vehicle is a major upgrade from our previous model, boasting a Palfinger PK 53002-SH crane and drop sides, allowing us to handle and transport larger assets more safely and efficiently than ever before. With its increased size and capability, we’re now equipped to take on even bigger, more complex jobs across the board.

A big shoutout to our wagon driver, Dennis, who was absolutely thrilled to get behind the wheel of this beast when it was delivered last week.

We’re constantly investing in the best equipment to support our clients and projects — and this new wagon is a game changer.
 

News Image
New IUS Wagon
summary
This impressive vehicle is a major upgrade from our previous model, boasting a PALFINGER AG PK 53002-SH crane and drop sides, allowing us to handle and transport larger assets more safely and efficiently than ever before.

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.